Horizontal Directional Drilling and Pipe Jacking

Trenchless laying of pipelines and cables. Construction of engineering networks.

Horizontal Directional Drilling and Pipe Jacking

Water supply, gas pipelines, sewerage, power cables, communication lines and more

Over 8 years of experience

Over 8 years of experience

Which allows us to carry out projects of any complexity
Team of professionals

Team of professionals

They know all the nuances of the work and carry out the project with high quality
A complex approach

A complex approach

A full range of services for the implementation of your turnkey project
Own fleet of special equipment

Own fleet of special equipment

This reduces both the cost and the timeline of your project

Horizontal directional drilling (HDD) in Tashkent and Uzbekistan

SPECSTROY carries out horizontal directional drilling and pipe jacking works. We have been operating since 2018, previously under the name BURSPETSMONTAZH. Our own fleet of drilling equipment, qualified crews, and experience on projects of national scale.

Our main focus is trenchless crossings for utility installation: water supply, gas pipelines, sewerage, power cables and fibre-optic lines. Diameters from 100 to 750 mm by HDD, and from 700 up to 2500 mm by pipe jacking.

More about the company

Trenchless Pipe Installation

We install pipelines using the HDD method without opening the ground: diameters from 100 to 750 mm, up to 250 m in a single bore.
The method works where a trench is impossible or too costly — under live roads, pavements, landscaped areas and irrigation channels.
We work with both HDPE and steel pipes.
Site visit by our engineer and preliminary cost estimate are free of charge.

Controlled Crossing Under Railways and Roads

Trenchless crossing beneath a railway or motorway without interrupting traffic.
Diameters from 100 to 750 mm, lengths up to 250 m.
We carry out crossings under live tracks, including the Afrosiyob high-speed rail line.
The bore path is set and monitored by a locating system — drilling follows the design level and exits at the specified point. The road surface is not opened, the embankment stays intact, and we handle the crossing approvals ourselves.

Power Cable and Fibre-Optic Installation

Trenchless installation of power cables and fibre-optic communication lines — either inside an HDPE casing ⌀100–750 mm or by pulling the cable directly, without a casing.
In 2022 we installed around 1 km of PvPu cable (cross-linked polyethylene insulation) from HPP-1 around the Tashkent Zoo.
We work in dense urban areas where digging a trench is not an option.

Trenchless Gas Pipeline Installation

Gas pipeline installation by HDD — polyethylene (PE) or steel pipe, diameters from 100 to 750 mm, lengths up to 250 m. We comply with required burial depths and clearances to existing utilities.
Where necessary, we carry out test pits to determine the exact position of live networks along the route.

Trenchless Sewerage Installation

Gravity and pressure sewerage by HDD, diameters from 100 to 750 mm, lengths up to 250 m. For gravity sections we maintain the design gradient — the bore path is monitored along the entire length.
We work in confined conditions: inside courtyards, under existing driveways and across landscaped areas, without damaging the surface.

Water Supply Installation by HDD

Trenchless installation of water supply lines: HDPE or steel, diameters from 100 to 750 mm, lengths up to 250 m. Used for building connections, road crossings and street network installation.
No open excavation — paving and planting remain untouched, and no reinstatement works are needed afterwards.

HDD Design and Approvals

We prepare working drawings for the crossing: route, burial depth, bore profile, calculations based on diameter and soil conditions, and a bill of materials.
For works requiring a design licence, we engage a licensed design organisation — the client does not need to find one.
We also handle approvals with utility owners and road authorities.

HDPE Pipe Welding

Butt fusion welding of polyethylene pipes. Carried out both as part of HDD works and as a standalone service at the client’s site.
Welding is priced separately from drilling; the cost depends on diameter and number of joints — we will quote against your specification.

Pipe Jacking, Diameters from 700 to 2500 mm

Installation of steel casings by pipe jacking — diameters above 700 mm, with technical capability up to 2500 mm. The method is used where the diameter exceeds what HDD can handle: casings for trunk gas and oil pipelines, crossings under railways and roads, embankments and canals. Completed projects include a ⌀1420 mm crossing 53.4 m long and a ⌀1220 mm crossing under the Bukhara–Nukus highway. Traffic is not interrupted and the embankment is not opened.

Preliminary calculation of the project cost

Pipe material

Pipe length, r.m.

Do you need pipe welding

Diameter

{{ total }} сум

Price including VAT

ВНИМАНИЕ расчёт является предварительным! В стоимость работ ГНБ не включены: сварка и стоимость труб, подготовка стартового и приёмного котлована, доставка спецтехники, а также шурфовка коммуникаций на объекте. Указанные цены ГНБ могут быть изменены в зависимости от общего объема работ, от длины и количества труб в одной скважине, от материала затягиваемых труб, от геологических свойств грунта и географии объекта.

We process the application

We process the application

Call +998 71 233 3239 or message us on Telegram / WhatsApp: +998 90 359 1379, +998 99 822 6035

We prepare an estimate

We prepare an estimate

We assess the scope and preliminary cost

We send a quotation

We send a quotation

You receive a commercial offer with pricing and timelines

Site visit

Site visit

Our engineer arrives within 24 hours

Estimate adjustment

Estimate adjustment

We finalise the project cost and schedule

Contract signing

Contract signing

We sign the works agreement

Works commence

Works commence

Drilling starts immediately after payment

Handover

Handover

On completion of the project

Completed projects

Pipeline installation by HDD, ADM Jizzakh, Jizzakh Region

Pipeline installation by HDD, ADM Jizzakh, Jizzakh Region

  • Length:

    406.5 m
  • Project date:

    03/02/2025
  • Pipe diameter:

    273–426 mm
Chupon-Ota Photovoltaic Plant, Samarkand — Enter Engineering

Chupon-Ota Photovoltaic Plant, Samarkand — Enter Engineering

  • Length:

    614 m
  • Project date:

    01/06/2023
  • Pipe diameter:

    160–200 mm
UTG (GTS) Trunk Pipeline Upgrade — Enter Engineering

UTG (GTS) Trunk Pipeline Upgrade — Enter Engineering

  • Length:

    53.4 m
  • Project date:

    01/09/2023
  • Pipe diameter:

    1420 mm
Crossing under the Bukhara–Nukus Highway

Crossing under the Bukhara–Nukus Highway

  • Length:

    34 m
  • Project date:

    01/10/2018
  • Pipe diameter:

    1220 mm